Investment overview
This investment analysis is based on the selected assumptions. Adjust the highlighted inputs to reflect site data and commercial terms. Economic benefits include cash savings, estimated losses avoided and the value of time saved.
First-site investment
Initial investment falls in Year 0, and operations begin in Year 1. Configure additional sites.
Cumulative costs, benefits and net present value
Totals run from Year 0 to the selected year-end. Net present value uses the selected discount rate.
Site expansion plan
Additional sites incur capital costs and start operating in their deployment year. For maintenance billing, enter 1 to start in the deployment year, 2 to start the following year or 0 to omit maintenance. Select how many sites in each deployment qualify for monitoring labor savings.
Add a deployment to model additional sites.
Scenario comparison
The conservative scenario applies 80% of the base first-year staffing realization rate, 85% of the staffing cash realization rate and 75% of the loss reduction rate. The optimistic scenario applies 120% of the base first-year staffing realization rate and 125% of the loss reduction rate, subject to a 100% cap on effective rates. All scenarios use the same deployment and cost inputs.
One year after payback
Steady-state annual benefits
Labor savings
Enter staffing and costs for one site, across all shifts. Include salaries, allowances, benefits and other employer costs. Set the cash realization rate to the share of staffing reductions expected to lower actual spending.
Staffing by role
Loss reduction
Enter the annual losses borne by one site. The model estimates avoided losses by applying the reduction rate to each loss category. Use site incident history, monitoring coverage and response performance to validate the inputs.
Enter annual work hours and injury counts for one site. The model uses these inputs to estimate injury-related benefits across operating sites.
Injury and compensation assumptions
A lost-time injury (LTI) causes at least one day away from work after the day of injury. Enter the annual hours and injury counts for the same operating scope.
For injury counts and daily replacement labor cost, enter 0 to use zero or leave the field blank to use the calculated value. The automatic injury counts use the warehouse and office injury mix reported by Aramex.
The automatic daily replacement labor cost uses the weighted annual cost per employee before deployment divided by 250 working days. Compensation reflects the estimated share of lost-time claims and the amount retained after insurance.
Annual losses and estimated amounts avoided
Time savings
Enter inputs for one site.
Vehicle gate processing
Count eligible vehicle movements once using a consistent basis. Compare queueing, verification and gate release times before and after deployment on the same lanes. Deduct overlap with any separately modeled delay savings or incremental order contribution.
Use avoidable waiting or detention charges and the contribution margin from attributable incremental orders.
Video retrieval, export and archiving
The cash realization rate assigns a share of time savings to labor cost reductions. The remaining value represents staff time freed up.
First-site operating costs and software licensing
Maintenance starts in the specified operating year. The base fee applies in the first billing year and increases annually up to the cumulative cap.
Annual software license
First-site license charges begin in Operating Year 1 using the selected pricing method.
Enter the number of licensed channels and the annual price per channel for each operating year.
Annual breakdown
Pre-tax economic analysis · USDThe table covers all modeled sites through the comparison period and extends to one year after payback where applicable.
Methodology and references
- Economic benefits. Add labor savings, estimated losses avoided and the value of time saved. The model applies per-site benefits to each operating site, with staffing savings for monitoring adjusted by deployment.
- Economic payback. The first year-end within the comparison period when cumulative net economic benefits are zero or above, after the final capital investment in that period. Discounted payback applies the same rule to discounted totals.
- NPV and ROI. Net present value discounts annual net economic benefits to Year 0. Cumulative ROI divides cumulative net economic benefits by cumulative project costs over the same period.
Benchmark sources
- Aramex 2025 Integrated Annual Report, pp. 79–80 for the historical warehouse and office injury mix.
- NFPA warehouse fire statistics, Table 2 for historical U.S. warehouse fire losses.
- RAK Logistics published tariffs for the truck waiting charge used to estimate the value of vehicle time.